Creating Safe
Connections
Solutions for today and tomorrow.
In a world constantly on the move, safety at the highest level isn’t a luxury, but a necessity.
Bridges2000 contributes to that safety by building and supplying reliable bridges and gangway connections. Our connections ensure that people can safely move from one side to another.
An example how fast we can deliver: “If you call right now in the morning
and you need a bridge in the afternoon or a gangway, it’s possible!”
GO FOR SAFE ACCESS
Examples of our solutions for safe bridging.
The World Harbor days
Hundreds of thousands of visitors discovered the port of Rotterdam during the 46th edition of the world harbor days. BRIDGES2000 is grateful to have been able to guide everyone safely from A to B.{more}
Back to the 15th century
BRIDGES2000 has supplied special coupling pontoons with a high load capacity for maintenance of a 15th century castle. This allowed our client to reach the wall with an excavator to strengthen it. {more}
Through the canals of Utrecht
Washing windows, painting window frames or other facade work? Work flexibly and compactly like this client, who uses our light pontoons in the beautiful canals of Utrecht. {more}
VIDEO’S
BRIDGES2000 – Van Oord
VAN OORD ISLANDS BUILDER IN DUBAI - WITH TWO CONNECTED SHIPS. {more}
BRIDGES2000 – Creating Safe Connections
BRIDGES2000 - Creating Safe Connection. {more}
BRIDGES2000 – Interview with Hendrik van der Ham
BRIDGES2000 - Interview with Hendrik van der Ham. {more}
PICTURES
Real world examples of our safe bridge connections.
TESTIMONIALS
“The handling went well”“We have to go over an obstacle on the quay to a pontoon in the port of Ostend. It is a LOADOUT for offshore. We would prefer it this Monday.”
Hendrik replied:
“That is possible, we have a gangway in combination with a bulwark for you!”And how was it handled:
“Everything was delivered on Monday afternoon. The gangway was already in one piece. We placed everything on advice and are very pleased with the fast, adequate service and the good product that was delivered. Then everything went very quickly with the project and the completion process went smoothly. also fine.”
“Just what we needed!”
“Because the bridges have become too low due to the high water, we have to finish our ships in Rotterdam. Do you have a number of 8 m and 12 m gangways ahead of us?”
Hendrik replied:
“Consider it done!”And how was it handled:
“Then they delivered exactly what we ordered and on time. And then the question came for a number of slightly longer ones. In our main implementation, they were even better than expected, wider and more stable. In addition, excellent service and fast delivery. I asked by email in the evening if gangways could be exchanged the other day. Immediately there was an answer, and the other day they just lay there, made to measure and clean: precisely fitting, strong gangways. Just what we needed.”
You will receive a quote for all common products within one hour. An introduction at our office is also possible.